Purpose | ||||||||||||||||||||||||||||||||
The APS Commissioning Readiness Review Team reports to the PSC DALD Operations and advises the appropriate final commissioning authorizer for all activities related to the safe commissioning of new or modified installations. The commissioning readiness review verifies that the approved designs were implemented in the installation process. It verifies that mechanical and vacuum systems are operational and validated prior to shielding verification of a new or modified installations. The review will ensure that the hardware, personnel, and documentation are in place to ensure safe reliable operations. It does not refer to setting up experiment-specific, transient systems and components (covered as part of the experiment safety review). |
||||||||||||||||||||||||||||||||
Method | ||||||||||||||||||||||||||||||||
CRRT is responsible for reviewing the readiness of new and modified installations for safe commissioning. All outstanding issues from the PSC Design Review Committee (PDRC) review are verified to be closed out by the CRRT. The plans for commissioning are reviewed to ensure that the components and equipment designs satisfy ANL and APS safety and operations requirements. Plans will be reviewed for consistency with APS schedules. The request to conduct a CRRT review is initiated by the appropriate final commissioning authorizer. A CRRT review will also be initiated on direct request by a Division Director, Deputy ALD or the ALD. The Committee will:
|
||||||||||||||||||||||||||||||||
Reports to | ||||||||||||||||||||||||||||||||
PSC DALD Operations. |
||||||||||||||||||||||||||||||||
Membership | ||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||
Meeting Frequency | ||||||||||||||||||||||||||||||||
Meetings will be held at the direction of the Committee Chair in response to requests for commissioning. |