Purpose | ||||||||||||||||||||||||||||||||||||||||||||||||||
Conducts design reviews (Design Review procedure) of any PSC project to determine the adequacy of a design in meeting its performance, safety and operational objectives.
The committee will:
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Method | ||||||||||||||||||||||||||||||||||||||||||||||||||
Evaluates design submittals to determine the scope and complexity of the design.
The PDRC chair determines which committee members are required to take part in the review, including the need for any additional SMEs and/or other safety committees. Review by the PSC Radiation Safety Committee for any new or modified designs of shielded enclosures and radiation safety system components is required. Combine the outcome of reviews by safety committees and subject matter experts, and, if necessary, reconcile any differences. Provide an advisory report to the appropriate final design approver per the APS Design Review Procedure (APS_000031), summarizing the findings and recommendations from the review. Track any review action items and provide a closeout report to the appropriate final design approver. File the reviewed documents, meeting minutes, and reports, in the APS Document Management System (DMS). Documents to be filed in the PDRC folio of the ICMS. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Reports to | ||||||||||||||||||||||||||||||||||||||||||||||||||
PSC DALD Operations. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Membership | ||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Meeting Frequency | ||||||||||||||||||||||||||||||||||||||||||||||||||
As required by design review process, as requested from management or at discretion of committee chair. |