• Long-Range Schedule
  • Publications
  • Science Highlights
  • Directory
  • Useful Links
  • Contacts
ANL Home

a U.S. Department of Energy Office of Science User Facility

  • About
    • Overview
    • Visiting the APS
    • Code of Conduct
    • Diversity, Equity, Inclusion & Accessibility Council
    • Mission & Goals
    • Organization Charts
    • PSC Leadership
    • APS Director’s Office
    • Committees
    • ANL Job Openings
    • APS Job Openings
    • Storage Ring Parameters
    • APS Conference Rooms
    • The Advanced Photon Source Strategic Plan
    • Early Science at the Upgraded Advanced Photon Source
    • Seminars & Meetings
    • More
  • Safety
    • PSC Safety Resources
    • Electrical Safety
    • EFOG
    • User Safety and Training
    • Building and Site Services Coordination
    • Safety & Emergency Management
    • More
  • Organization
    • APS Director’s Office
      • User Program Office
      • Photon Sciences Communications and Information Resources
      • Photon Sciences Portfolio Management Office
    • Accelerator Systems Division
      • Accelerator Operations & Physics
      • Controls
      • Diagnostics
      • Magnetic Devices
      • Power Systems
      • Radio Frequency
      • MCR
    • APS Engineering Support Division
      • Information Solutions
      • Information Technology
      • Design and Drafting
      • Experimental Facility Operation Group
      • Mechanical Engineering and Design
      • Mechanical Operations and Maintenance
      • Safety Interlocks
    • X-ray Science Division
      • Inelastic X-ray & Nuclear Resonant Scattering (IXN)
      • Magnetic Materials (MM)
      • Materials Physics and Engineering (MPE)
      • Surface Scattering and Microdiffraction (SSM)
      • Time-Resolved Research (TRR)
      • Chemical and Materials Science (CMS)
      • Dynamics & Structure (DYS)
      • GMCA Structural Biology Facility (MX)
      • Imaging (IMG)
      • Microscopy (MIC)
      • Spectroscopy (SPC)
      • Structural Science (SRS)
      • Beamline Controls (BC)
      • Beamline Instrumentation (BI)
      • Computational X-ray Science (CXS)
      • Detectors (DET)
      • Nanopositioning Support Lab
      • Optics (OPT)
      • Scientific Software Engineering and Data Management (SDM)
    • APS Upgrade Project
    • Organization Charts
    • More
  • User Info
    • User Check List
    • Training for Users
    • Shipping Samples
    • ESAF system login
    • Proposal system login
    • More
  • Beamlines
    • Beamlines Directory
    • Comparable Beamline Options for Users
    • Requirements for Restarting Beamlines After the Shutdown
    • Sectors Directory
    • More
  • Machine Status
    • APS Storage Ring Current History
    • Construction Schedule
    • More
  • APS Upgrade
  • Media Center
    • APS/User News
    • Science Highlights
    • Research Highlights Books
    • APS Fact Sheets
    • Image Bank
    • APS Slides
    • APS brochure
    • More
  • Home
  • About
  • ANL Job Openings
  • APS Brochure
  • APS Highlights Book
  • APS Job Openings
  • APS-U
  • APS/User News
  • Beamlines
  • Contacts
  • DEIA
  • Directory
  • Document Central
  • Guest House
  • Industry
  • Intranet
  • Long-Range Schedule
  • Machine Status
  • Media Center
  • Organization
  • Publications
  • Safety
  • Science Highlights
  • Search
  • User Info
  • Useful Links
  • Work with Us
ANL Home

APS U

  • APS Upgrade Home
  • About the APS Upgrade
  • FAQ
  • New Storage Ring
  • Feature Beamlines
  • Videos
  • People of the APS Upgrade
  • Workshops, Meetings & Town Halls
  • Organization Chart
  • Sharepoint (Password Required)
  • Documents
  • Comparable Beamline Options for Users
  • Requirements for Restarting Beamlines After the Shutdown
  • Progress in Pictures

APS Upgrade News

07.14.2023
Installation of new Advanced Photon Source storage ring begins
07.07.2023
Ready, set, upgrade: Advanced Photon Source’s overhaul is underway
07.07.2023
Speaking my language: Robert Winarski’s background helps him coordinate beamline installation for the Advanced Photon Source Upgrade
06.14.2023
Historic Advanced Photon Source magnet sees the light of day for the first time in 29 years
06.13.2023
Ashley Wayman keeps the beamlines running smoothly before, during and after the APS Upgrade
05.03.2023
APS Upgrade team completes 100th module for new storage ring
04.17.2023
Argonne’s Advanced Photon Source prepares for its renewal
03.17.2023
Aleksander Stankovik keeps track of the thousands of components needed to upgrade the Advanced Photon Source
02.07.2023
Tiffany Freedman helps the APS Upgrade move forward safely
11.28.2022
Vacuum System Installation Points Toward Completed Modules for the APS Upgrade Storage Ring

Pagination

  • Current page 1
  • Page 2
  • Page 3
  • Page 4
  • Next page ››
  • Last page Last »
Subscribe to News
  • Intranet
  • For Employees
  • Work with Us
  • Industry
  • Guest House
  • Document Central
  • Job Openings
  • Facebook
  • Twitter
  • YouTube
  • Flickr

The Advanced Photon Source is an Office of Science User Facility operated for the
U.S. Department of Energy Office of Science by Argonne National Laboratory
UChicago Argonne LLC | Privacy & Security Notice

  • Facebook
  • Twitter
  • YouTube
  • Flickr

The Advanced Photon Source is an Office of Science User Facility operated for the
U.S. Department of Energy Office of Science by Argonne National Laboratory
UChicago Argonne LLC | Privacy & Security Notice