Argonne DOE-BES Central User Facility |
|
System to manage beamline components. |
Links to the beamline websites and to detailed information about the equipment, techniques and contact information of a beamline. |
Floor coordinator’s downtime entry and reporting system. |
Beamline Downtime Report - Main Control Room |
Long term schedule query and edit. Beamline schedule query and edit. Watchman and PSS data. |
Allows user to submit budget proposals via the web. |
Query, entry and reporting of beamline statistics for ALD use only. |
Allows any experimenter to submit a proposal to conduct an experiment at an APS beamline. |
Administration application that allows users to maintain a list of personnel that currently fill different roles in each CAT. |
This application allows users to submit proposals to conduct an experiment at the CNM. |
This is a survey form that an experimenter is encouraged to fill out at the end of an experiment. |
This is a survey form that an experimenter is encouraged to fill out at the end of an experiment. |
Detector pool reservations system. |
Allows users the ability to submit a electronic form detailing the experiment they will be conducting with a particular emphasis on safety issues. |
System to track equipment. |
Maintains a log of experiments conducted on the experiment floor. |
APS Effort Scheduling & Total Time Reporting. |
System to allow users to perform life safety inspections. |
System to track shielding components on APS equipment. |
Main control room's downtime entry and reporting system. |
Screens to aid in managing parts of the GUP system. |